Categories: Swimming

Spartan Males Prolong Lead After Day Two of Spartan Splash

This web page was created programmatically, to learn the article in its unique location you’ll be able to go to the hyperlink bellow:
https://ycpspartans.com/news/2025/11/22/mens-swimming-spartan-men-extend-lead-after-day-two-of-spartan-splash.aspx
and if you wish to take away this text from our web site please contact us


YORK, Pa. – The York College males’s swimming staff received 5 of 12 occasions with 9 top-three finishes to stay within the lead after day two of the Spartan Splash on Saturday.

The Spartans now have 646 factors and almost doubled their lead from day one as they maintain a 298.5-point margin over Widener (347.5 pts.) who moved into second, adopted by Stevenson (336 pts.), Arcadia (335 pts.) and Elizabethtown (301.5 pts.) within the top-five.

The Spartans swept each relays on the night time starting with the 200 medley as Bryce Miller, Cooper Stiles, Brenden Stuhltrager and Nick Bordovsky teamed up for the successful time of 1:33.10. York closed out the night time by ending first within the 800 free relay with Bryan Collins, Cooper Stiles, Ryan Gray and Colin McLallen combining for the highest time of seven:09.89.

York additionally nabbed three particular person wins on the night time with Stuhltrager within the 100 fly, Stiles within the 100 breast and Miller within the 100 again.

The Spartans additionally secured three second-place finishes with McLallen in  the 400 IM, Gray within the 200 free and Collins within the 100 breast.

Ben Stambaugh captured a third-place end for York within the 200 free with a time of 1:50.03.

First Place Finishers

Brenden Stuhltrager – 100 Fly (49.80)

Cooper Stiles – 100 Breast (57.69)

Bryce Miller – 100 Back (50.68)

Second Place Finishers

Colin McLallen – 400 IM (4:25.55)

Ryan Gray – 200 Free (1:48.34)

Bryan Collins – 100 Breast (59.12)

Third Place Finishers

Ben Stambaugh – 200 Free (1:50.03)

Top-Three Relay Finishes

1st – 200 Medley Relay: Bryce Miller, Cooper Stiles, Brenden Stuhltrager, Nick Bordovsky – 1:33.10

1st – 800 Freestyle Relay: Bryan Collins, Cooper Stiles, Ryan Gray, Colin McLallen – 7:09.89

Up Next

The Spartans return to their dwelling pool on Sunday for the third and ultimate day of the Spartan Splash. Prelims begin at 9 a.m. adopted by finals at 4 p.m.

 


This web page was created programmatically, to learn the article in its unique location you’ll be able to go to the hyperlink bellow:
https://ycpspartans.com/news/2025/11/22/mens-swimming-spartan-men-extend-lead-after-day-two-of-spartan-splash.aspx
and if you wish to take away this text from our web site please contact us

fooshya

Share
Published by
fooshya

Recent Posts

Waterfront Fort Myers House Gives Luxurious Boating Life-style

This web page was created programmatically, to learn the article in its unique location you…

20 minutes ago

‎Wikily.gg – Gaming Wikis App

This web page was created programmatically, to learn the article in its authentic location you…

40 minutes ago

ASUS ROG Strix Gaming PC – Professional Efficiency

This web page was created programmatically, to learn the article in its unique location you…

42 minutes ago

Texas companions cut up $142,000 roping in Oklahoma

This web page was created programmatically, to learn the article in its authentic location you…

43 minutes ago

Now That NASA’s Artemis II Has Returned, What Happens Subsequent?

This web page was created programmatically, to learn the article in its authentic location you…

59 minutes ago

“Less Is Genuinely More Here”: Indian Lady Opens Up About Lifestyle Adjustments After Shifting To Singapore

This web page was created programmatically, to learn the article in its authentic location you…

1 hour ago