Dream Chaser spaceplane advances towards first mission after finishing key pre-flight assessments at KSC

This web page was created programmatically, to learn the article in its authentic location you’ll be able to go to the hyperlink bellow:
https://defence-industry.eu/dream-chaser-spaceplane-advances-toward-first-mission-after-completing-key-pre-flight-tests-at-ksc/
and if you wish to take away this text from our web site please contact us


Sierra Space has confirmed that its Dream Chaser spaceplane has accomplished a collection of important pre-flight assessments at NASA’s Kennedy Space Center, marking continued progress towards its first free-flyer mission. The firm stated the work kinds a part of a wider marketing campaign that can confirm Dream Chaser’s readiness for flight and future operational use.

 

As a part of the testing sequence, Dream Chaser underwent Electromagnetic Interference and Electromagnetic Compatibility testing at NASA’s Space Systems Processing Facility. These assessments verified the spacecraft’s capability to function safely inside anticipated electromagnetic environments throughout its deliberate missions.

The spaceplane additionally accomplished excessive velocity tow assessments at Kennedy Space Center and Space Florida’s Launch and Landing Facility. A Freightliner Cascadia truck offered by Daimler Truck North America towed the car to simulate touchdown dynamics and validate autonomous navigational parameters throughout runway operations.

 

 

Sierra Space additional confirmed that Dream Chaser efficiently demonstrated its capability to obtain telemetry and distribute instructions between the spacecraft and Mission Control in Louisville, Colorado by NASA’s Tracking and Data Relay Satellite System. This milestone examined actual time command and management functionality forward of future flight operations.

The firm concluded the marketing campaign with a put up touchdown restoration rehearsal designed to confirm the safing of car programs and guarantee speedy entry to delicate payloads. With these steps accomplished, Dream Chaser will transfer to its remaining spherical of acoustic testing in December 2025.

Sierra Space plans to discover and carry out modifications for nationwide safety functions in Colorado after acoustic testing. The firm stated these upgrades intention to broaden Dream Chaser’s versatility and assist a variety of mission necessities linked to nationwide defence.

 

 

The spaceplane stays on observe for its first launch to Low Earth Orbit within the fourth quarter of 2026 below an indication mission for the CRS-2 contract, with a runway touchdown deliberate at Vandenberg Space Force Base. Fatih Ozmen, Executive Chair at Sierra Space, stated, “Each milestone we achieve is a testament to the resilience, innovation and dedication of the Sierra Space team, and represents another significant step forward in ensuring Dream Chaser’s success as a versatile, reusable spacecraft,” including, “We are excited to see Dream Chaser progressing steadily toward its inaugural flight to support the nation’s most pressing space priorities.”

Sierra Space stated it stays dedicated to advancing area transportation, exploration and defence by options designed to safeguard nationwide safety and guarantee freedom of operations past Earth.

 


This web page was created programmatically, to learn the article in its authentic location you’ll be able to go to the hyperlink bellow:
https://defence-industry.eu/dream-chaser-spaceplane-advances-toward-first-mission-after-completing-key-pre-flight-tests-at-ksc/
and if you wish to take away this text from our web site please contact us

Leave a Reply

Your email address will not be published. Required fields are marked *